Munchkin Gas-Fired Hot Water Boiler Installation Manual Page 42

  • Download
  • Add to my manuals
  • Print
  • Page
    / 68
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 41
41
GAS-FIRED HEATER Installation Manual
BE FACING UP
INTAKE
EXHAUST
IMPORTANT:
INTAKE LEG MUST
EXTERIOR WALL
SUPPORT BRACKETS
MUST BE USED ON
ALL HORIZONTAL
AND VERTICAL PIPING
MIN.
1"
Fig. 7-11 2” sidewall vent with 2” concentric vent
kit (KGAVT0501CVT)
12" MIN.
TOP VIEW
(TEE)
INTAKE
EXHAUST
(STRAIGHT
COUPLING)
1" MIN.
RIGHT SIDE VIEW
(TEE)
EXHAUST
INTAKE
EXTERIOR WALL
COUPLING)
(STRAIGHT
SUPPORT BRACKETS
MUST BE USED ON
ALL HORIZONTAL
AND VERTICAL PIPING
12" MIN.
1" MIN.
Fig. 7-9 2” sidewall vent with tee (intake) and
coupling (exhaust)
NOTE: EXTENDED VENT
RUNS WHEN TRANSITIONING
TO A LARGER DIAMETER
MUST ALWAYS TAKE PLACE
IN A VERTICAL POSITION
TO PREVENT CONDENSATE
BLOCKAGE.
EXTERIOR WALL
TOP VIEW
EXHAUST
VENT KIT
INTAKE
RIGHT SIDE VIEW
VENT KIT
EXHAUST
SUPPORT BRACKETS
MUST BE USED ON
ALL HORIZONTAL
AND VERTICAL PIPING
Fig. 7-10 2” sidewall vent with V500 kit
I. DIAGRAMS FOR SIDEWALL VENTING
**Important Note: All vent pipes must be
glued, properly supported, and the exhaust
must be pitched a minimum of a 1/4" per
foot back to the heater (to allow for
drainage of condensate).
Page view 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 67 68

Comments to this Manuals

No comments